River Bridge Over Kabul River in Islamabad-Peshawar Motorway
BACK TO PROJECTS

Name of associated firm :
PEAL
Project Location within Country:
Islamabad – Peshawar
Start Date:
1992
Completion Date:
2007

Project Description

This bridge is 495 M long and each span is 45 M. It's a pre-stressed beams structure.

 

Services

  • Topo-Survey & River Bed Survey

  • Hydrological Investigation

  • Detailed Design & Drawings

  • BOQ, Specifications & Tender Drawings

  • Monitoring

  • Construction Supervision 

 

Other Projects In This Sector