The project starts from the outskirts of Jhelum City designated at km 0+000 and terminates on the outskirts of Rawalpindi City at km 96+490 before the Soan River bridge. The cumulative length of the project is 61 kilometres. The original project comprised of providing Direct Asphalt, Concrete Overlay on the existing DST pavement with strengthening/DST of shoulders for 90% of the project length. The remaining 10% required reconstruction of the existing embankment/pavement. However, as a result after the pavement design review, Subbase, Aggregate base and 20 cm Asphalt Concrete was also provided.
Services
Review of Original Pavement Design and Redesign of the pavement
Design of Horizontal Alignment/Vertical Profile
Traffic Sign Plans
Construction Supervision
Construction Supervision
- Contract Management
- Processing of contractor invoices, claims, time extension cases etc.
- Supervision of following construction activities
Earth Works
Laying of Subbase Course
Laying of Aggregate base Course
Laying of Asphalt Concrete
Construction of Stone Masonry Retaining Wall
Construction of Stone Masonry and PCC/RCC Drains
Installation of Overhead Gantry Signs
Installation of Traffic Sign
Miscellaneous Activities