Rectification and Overlay Project. The project consisted of rectification of the deteriorated pavement of the then existing (160 km) of Karachi - Hyderabad Super Highway by altogether removal of the rough & deformed sections of the highway, replacing the removed pavement and then providing asphaltic overlay of 3.5 inch thickness. Regained the life of pavement for another 10 years. The scope of included bridges & culverts enroute.
Services
Detailed construction supervision for asphalt concrete pavement
Contract management
Quality assurance
Checking & verification of measurements