Farm to Market Roads Phase-II (134 km)
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Mansehra NWFP
Start Date:
June 01, 1990
Completion Date:
May 03, 1993

Project Description

This project consisted of 9 Farm to Market Roads in the district of the Mansehra province of NWFP, total length of 134 km road.

 

Services

A. Detailed Engineering Design:

  • Carried out Topographic Surveys, Geotechnical & Hydrological Investigation and Traffic Surveys

  • Assisted, in consultation with ADB/C&W departments in the preparation of detailed programme, collection/ analysing socio-economic & traffic data for project benefit monitoring and evaluation (PBME) on 20% of the road lengths

  • Examined the existing design standards/specification of rural roads and evaluate suitable design standards/criteria & specifications

  • Prepared detailed designs/drawings/reports

  • Prepared BOQ, specifications & tender documents

  • Prepared & submitted of Project Completion Report for the Government of Pakistan and the Donor Agency

B. Construction Supervision:

  • Detailed construction supervision of (134 km) Farm-to-Market Road including bridge & structure

  • Contract management

  • Quality assurance

  • Checking & verification of measurements

  • Project scheduling & progress report

 

Other Projects In This Sector