Agricultural Road (50 km)
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Ghat, Elbarkat, Elsein
Start Date:
January 1981
Completion Date:
January 1982

Project Description

Agriculture Farm to Market Roads 50 km including bridges/culverts carried out by ECIL principal consultants (in a consortium of firms, namely Consultants International Ltd. connecting the town of Ghat, Elbarkat, Elsein.The involvements of the firm including the following:

  • Field Survey/Reccy

  • Geotechnical Investigation, Hydrological Studies/Reports

  • Traffic Studies

  • Preliminary Design

  • Final Design/Drawings

  • Design Reports

  • Material Reports/Testing

  • Road Design Special Areas: Deserts, Hilly

  • Alternate Materials for Cost Effects

  • Assessment of used Equipment/Maintenance

 

Other Projects In This Sector