The Gawadar - Turbat Section is part of the Gawadar - Ratodero Motorway Project (889 km) connecting the N-55 highway to the Gawadar Port. It will be a 4 lane divided facility designed for 120 KPH speed. Presently a single carriageway of 7.3 m wide asphaltic pavement and 3.0 m wide treated shoulders is to be constructed.
The project involved a feasibility study of Gawadar - Rato Dero Motorway (889 km) and detail design of Gawadar - Turbat Section (164 km) and Turbat - Awaran Section (76 km). The feasibility studies included traffic studies/forecasts, soil and hydrological studies, project costing, and economic analysis. The detailed design phase included geometric design on MOSS system pavement design, structural design, design of road site facilities, preparation of construction drawings and tender documents for bidding, and cost estimates.
ECIL was the lead coordinating consultants for developing design criteria/standards, coordination of design activities among section consultants, co-ordination with client, and preparation of consolidated feasibility studies, and PC-1 for the entire motorway project as designed by five (5) sectional consultants.
Services
Feasibility Study
Detailed Design
ECIL undertook following tasks for the above work at (1) & (2)
Road & structure condition survey
Engineering survey consisting of traverse survey, topographic survey, and cross section levelling
Traffic & axle load survey and traffic forecast
Road roughness survey
Benkelman beam, deflection, hydrological investigations study
Soil Investigations, Geotechnical & material investigations
Prepared preliminary design & preliminary cost estimates
Prepared economic feasibility which includes the derivation of Benefit Cost Ratio (BCR), Internal Rate of Return (IRR), Net Present Value (NPV) and ratio of project cost for the first year benefits of the project to demonstrate the economic and technical feasibility, including testing the results on HDM model
Feasibility report
Detailed engineering design of overlay & other improvement works, including bridges & structures
Tender documents & cost estimates