Design
In accordance with scope of work, 40 km long B.D. Shah - Gurguri road was to be rehabilitated and widened to 5.5m width. The repair/ strengthening / winding of existing 3 bridges, 14 causeways and 63 culverts, Additional structures to be provided where ever required.
Project Management
Construction supervision and project management during construction phase
Services
Topographic survey, including GPS, Traverse and control levelling
Soil Investigation and Testing
Condition survey of existing structures
Hydrology
Traffic Survey and studies
Pavement Design
Horizontal Alignment and Vertical profile design
Design of Structures (Culverts, Causeways, Bridges, Retaining wall etc.)
Preparation of conditions of contract, Project specification, tender drawings
Preparation of BOQ and Engineer's Estimate
Bid Evaluation
Preparation of Construction Drawings
Design coordination / Support during the construction phase