The project comprised of three components:
Baldia Trunk & Secondary Sewers ranging from diameter 200 mm to 1500 mm. Pipe-work of over 300 mm diameter with PVC lined to prevent internal corrosion (of total length approx. 37 km).
Lyari Trunk Sewer of RCC box culvert sizing of 2m x 2m, 11 km in length passing through the right bank of Lyari River from Sir Shah Sulaiman Road to Mauripur Sewage Treatment Plant.
54 mgd capacity sewage treatment plant based on waste stabilization pond lagoon system at Mauripur, Karachi.
Services
The Trunk Sewers were designed to carry all the wastewater from the city to the treatment plant. Lyari Trunk Sewer runs on the bank of Lyari River to Mauripur Sewerage Treatment Plant.
Mauripur Sewage Treatment Plant was designed to treat all the wastewater carried out by these Trunk Sewers and then use this treated water for irrigation purpose also.
ECIL carried out design & construction supervision of the above work which includes:
Topographic Surveys
Soil Surveys
Hydraulic & Process Design
Detailed Design & Drawings
Tender Documents & Cost Estimation