The Old Ruwais Housing Complex is situated around 240 Km in the west of Abu Dhabi. This housing complex is comprised of 2.0 million sq.m area and was built in 1979. ADNOC took the initiative to rehabilitate the existing facilities in the housing complex which is comprised of complete infrastructure, roads / services and huge development comprising of 1080 villas, more than 20 Multilow Rise Buildings, Sewerage Treatment Plant Power Grid and Substations. ADNOC took the initiative to determine the existing condition of the various components of Ruwais Housing Complex including the complete infrastructure and buildings.
Services
In three phases following services were provided:
Phase - I
Data Collection and Condition Assessment related to the following:
Roads (Pavement Evaluation using Loser Profilometer)
Traffic Impact Study
Water Supply System
Sewerage Collection and Disposal system
Storm water Drainage System
Existing Groundwater Management system
Recommendation for further Evaluation
Phase II
During the Phase II a Comprehensive Feasibility Report, highlighting Technical and Financial aspects viability was prepared
Phase – III
After the approval of ADNOC on Feasibility Study Report following activities were carried out in Phase – III of the project.
Rehabilitation engineering inspection of 1280 villas and 60 buildings
Design of Complete road network
Design of Water Supply System
Design of Sewerage Collection and Disposal system
Storm Water Drainage System
Rehabilitation of Ponds
Design of Rehabilitation Works of the Sewerage Treatment Plant and its Construction Supervision
Preparation of complete Tender Documents