Al Quosh Water Treatment Plant is a recent initiative of Ministry of Municipalities and Public Works General Directorate of Water, Government of Iraq. This proposed Treatment Plan will be situated inside the site of the Mosul Left Bank WTP. The objective of this project is to enhance the capacity of the existing treatment plant.
The source of the raw water would be river Tigris from where the water will be pumped into the proposed Low Lift Station. A 2.2 Km long Forcemain with a diameter of 700 mm will carry the water to the proposed Al Quosh Water Treatment Plant. Since the project is spread over at three different sites, therefore it is imperative to divide scope of the services based on the facilities and components required at each particular site.
Services
ECIL is providing the following Services to the Client
Low Lift Pump Station
Water Treatment Plant
Telkefe Boosting Station
Talluskuf Boosting Station
Derstoon (Badria) Boosting Station
ECIL rendered the following Works on each Site Plants
Architectural work
Structural Design work
Infrastructure Work
MEP Works for Pump Station, Power Building and Operator House (Internal buildings' MEP layouts & sections, design calculation and details)