Report on Study of Sea Water Intake includes information about
Pumping machinery of 25 m Head
Continuous flow 35,000 cu.m per hour
Four alternative proposals with design of reservoir and rising mains 72" to 96" diameter
Services
This is a critical study of Sea Water Intake Works. It includes a vast experience of coastal areas, water related structures, rising mains, reservoirs, pumping stations, etc. It involves experience about blast furnace and how to control temperature inside and outside blast furnace and its related machinery. A survey of the project area was carried out, followed by testing of seawater and then designed the rising main and reservoir also.