Manzoor Colony is a densely populated area (approx. 300 acres) with no sewerage system. Detailed survey& design of a proper sewerage network had been carried out for the implementation of the project. All the waste water collected at a pumping station and then pumped to TP-1 at Mahmoodabad. The task of the assignment was to improve the existing sewerage facility, a whole new network with all modern sewerage facilities.
Services
Preparation of Design Report
Topographic survey
Detailed design of the sewerage network and pumping station
Preparation of drawings
Preparation of tender documents, technical specifications and bill of quantities