Preparation of Feasibility Report, Detailed Design & Construction Supervision of Standby Syphons 19 & 20
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Karachi
Start Date:
1984
Completion Date:
1985

Project Description

The project is a part of Bulk Water Supply for Karachi comprising of replacing existing conduit of Water Supply with 84" diameter M.S pipe from Sophura Goth to COD Filter plant (approx. 8.4 km long). The M.S pipe is especially internally cement lined and externally projected against corrosion.

 

Services

  • Feasibility Study Report about the implementation of the project

  • Topographic survey of the project area

  • Technical studies of the feasibility of MS pipe and other related structures

  • Detailed design and preparation of drawings

  • Construction supervision of the whole project

  • Quality control and testing of material

  • Monthly Progress Report and identification of problem areas and advising the client accordingly

  • Preparation of Tender documents and cost estimates