The project comprises the establishment of following eight (8) new buildings and other facilities at the University of Karachi:
Institute of Proteomics
Institute for Sustainable Halophyte Utilization
Establishment of the Botanical Garden
Development of Multi-Storey Blocks for Staff Residence
Construction of Student Hostel
Establishment of the Hostel for Visiting Faculty
Development of Department of Statistics (2nd Phase)
New Building Extension, Department of Physics
Survey & Design of Water & Sewerage Network of University Campus
Total Covered area of the Building is 141, 584 sq.ft.
Total Covered area of the Water & Sewerage Network is 1,325.365 Acres.
Start Date (month/year): Completion Date (month/year):
Design: Apr-2004 May-2007
Supervision: Jul-2008 Dec-2010
Services
Consultancy services comprise of following:
Detailed survey and investigations
Architectural planning and Design
Design of building structures / services
Construction documents
Evaluation of bids
Awards documents
Detailed Supervision of construction work
Water Supply & Sewerage Network