Eight (8) New Buildings, Allied Facilities, Botanical Garden and Water Supply and Sewerage Network at University of Karachi
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Karachi
Start Date:
April 2004
Completion Date:
December 2010

Project Description

The project comprises the establishment of following eight (8) new buildings and other facilities at the University of Karachi:

  • Institute of Proteomics

  • Institute for Sustainable Halophyte Utilization

  • Establishment of the Botanical Garden

  • Development of Multi-Storey Blocks for Staff Residence

  • Construction of Student Hostel

  • Establishment of the Hostel for Visiting Faculty

  • Development of Department of Statistics (2nd Phase)

  • New Building Extension, Department of Physics

  • Survey & Design of Water & Sewerage Network of University Campus

Total Covered area of the Building is 141, 584 sq.ft.

Total Covered area of the Water & Sewerage Network is 1,325.365 Acres.

 

Start Date (month/year):                                 Completion Date (month/year):

Design: Apr-2004                                              May-2007

Supervision: Jul-2008                                        Dec-2010

 

Services

Consultancy services comprise of following:

  • Detailed survey and investigations

  • Architectural planning and Design

  • Design of building structures / services

  • Construction documents

  • Evaluation of bids

  • Awards documents

  • Detailed Supervision of construction work

  • Water Supply & Sewerage Network