Minor Canal outtakes' from Abbasia Canal at Head Farid. The Project comprises of design and construction supervision of Minor Canal with two offtaking channels equal to 8.5 Km in length; discharge capacity 82 cusecs, Al Nahyan Agriculture Farm Salluwali Rahimyar Khan to supply irrigation water for His Highness Shaikh Zayed Bin Sultan
Services
Survey, Design Preparation, Detailed Drawings, Preparation of BOQ, Specifications, Tender Documents, Evaluation Report and Construction Supervision.
The Details are as under:
Detailed topographic survey of the project area
Preparation of alternate design options for the canal
Preparation of brick lined channel design, CC lined channel design
R.C.C. lined channel design; brick-cum CC lined canal design
Preparation of detailed design of CC lined, R.C.C. lined, brick-cum-CC lined channel and hydraulic structures
Preparation of Tender Documents & Evaluation of Bid Documents
Preparation of Construction Drawings
Construction Supervision of the Brick-cum-CC lined Canal
Preparation of As-Built Drawings and certifying bids for payment