Phase-II comprised of replacement of Barrage Gates and rehabilitation of Head Regulators' Gates. In addition, sub-regulator & roadway deck have been replaced and improved off-take conditions for the Kalri Baghar Circle Canal and improved overall water management of the left bank canal system. Whereas Phase-III involves remedial works to allow the removal of the head limitation across the barrage and to increase design differential head to 32 feet.
Services
Soil investigation
Economic Study & Feasibility
Planning & Design
Structural Design & Engineering
Specification & Tender Document
Construction Supervision
Contract Management
Training