Pasni Fisheries Harbour
BACK TO PROJECTS

Name of associated firm :
PRC, Engineering Inc., U.K
Project Location within Country:
Province of Balochistan
Start Date:
January 1987
Completion Date:
June 1989

Project Description

 

  • Construction of the fishing harbour for 500 vessels, up to 1,200 tons gross weight, draft 2 meters

  • Construction of breakwater, total length 1,225 meters

  • Construction of additional groynes for shore protection

  • Capital dredging in the basin area of 5 million cubic meters and reclamation of berthing area

  • Construction of cargo quay with 4 meter draft

  • Construction of power house, fish market hall, workshop and port authority building

  • Construction of fuel storage tanks

  • Construction of hard standing area and access roads

 
 

Services

The services included subsoil investigation, design, tender documentation and construction supervision as follows:

  • Subsoil Investigation

  • Design of all onshore work, including buildings, roads

  • Design of water supply system, development of well rising main storage tank, and overhead tanks

  • Design of utilities and services for buildings and areas

  • Preparation of tender documents, tender evaluation recommendations etc.

  • Capital Dredging and Land Reclamation to Constructed harbour quay wall & reclamation thereof

  • Construction supervision of entire work, including dredging of basin