Consultancy Services were procured to carry out feasibility study for identifying and evaluation of the potential transmission line corridors to implement an effective power dispersal scheme for the major hydropower projects envisaged in Pakistan Power Generation Vision 2025. The project entails comprehensive study using latest remote sensing technologies on GIS platform and subsequent verification and generation of longitudinal and cross profiles through physical field survey and Digital Elevation Model. The project in itself is a challenging task as it required identification of optimal and feasible corridors through high relief mountains reaches and confining valleys which includes identification of switch yard locations for the proposed power plants in Indus and Kunhar river valleys including Basha Dam Site location.
Services
Identification of 765 KV Transmission Lines Routes connecting Manshera to Bunji through Indus and Kunhar river valleys
The project requires GIS based studies using remote sensing technologies using high and low resolution satellite imageries and digital elevation data
The physical topographic survey was also required to generate the longitudinal and cross section profiles of the selected corridors for the transmission lines using topographic data in GIS digital format
The survey also requires identification of optimal switch yard location for the proposed power generation plants in the area and its integration in GIS
Transmission Lines Tower spotting locations were also required to use high resolution satellite imageries and subsequent verification through field survey
ECIL also developed comprehensive Environmental and Geological assessment on a GIS platform which substantiates major requirement for feasibility of the transmission line corridors
The Associates M/s BARQAAB and PES - EASE-PAK also provided technical support and assessing the power dispersal scheme