150 MW Western Electric Ltd. (WEL) Power Plant - Surveys & Studies Report
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Karachi - Pakistan
Start Date:
June 12, 2004
Completion Date:
September 2004

Project Description

 

  • Topographic survey of 30 Acres of Plan site

  • 7.5 km - 100m corridor topographic survey for transmission line

  • 1.5 km - 100m corridor survey of site accedes road

  • Survey of infrastructure i/c. water, electricity, and waste water disposal

  • Geotechnical investigations